The project includes a finished product warehouse, crystallization packaging, concentration, purification and separation workshop for the biointegration continuation project. The main steel frame project of the steel structure and all the work except for the roof, exterior wall maintenance structure and decoration project specified in the bidding documents totaled 8,800 square meters.
The project includes a finished product warehouse, crystallization packaging, concentration, purification and separation workshop for the biointegration continuation project. The main steel frame project of the steel structure and all the work except for the roof, exterior wall maintenance structure and decoration project specified in the bidding documents totaled 8,800 square meters.
Heavy steel structure workshop construction and production technology: including process selection, lofting, numbering, cutting, correction, forming, edge processing, pipe ball processing, hole making, friction surface processing, end processing, component assembly, round pipe component processing and steel component pre-assembly. The steel after blanking and marking must be cut according to its desired shape and size.
The following points should be paid attention to when cutting:
When there are many parts arranged on a steel plate and there are several intersecting shear lines, a reasonable shearing procedure should be arranged in advance before shearing.
The following process points should be paid attention to when performing gas cutting operations:
When cutting, the shape of the oxygen jet (wind line) should be adjusted so that it reaches and maintains a clear outline, long wind line and high firing power. The cold correction of finished products is generally corrected by mechanical forces such as flange levelers, straightening machines, hydraulic presses, and presses.